The Decision of the Maximum Synchronous Torque During the Solar Array Deployment Using the Closed Cable Loop

[{“box”:0,”content”:”n[if 992 equals=”Open Access”]n

n

n

n

Open Access

nn

n

n[/if 992]n[if 2704 equals=”Yes”]n

n

Notice

nThis is an unedited manuscript accepted for publication and provided as an Article in Press for early access at the author’s request. The article will undergo copyediting, typesetting, and galley proof review before final publication. Please be aware that errors may be identified during production that could affect the content. All legal disclaimers of the journal apply.n

n[/if 2704]n

n

Year : 2025 [if 2224 equals=””]26/09/2025 at 3:31 PM[/if 2224] | [if 1553 equals=””] Volume : 15 [else] Volume : 15[/if 1553] | [if 424 equals=”Regular Issue”]Issue : [/if 424][if 424 equals=”Special Issue”]Special Issue[/if 424] [if 424 equals=”Conference”][/if 424] 15 | Page : 37 49

n

n

nn

n

n

n

    By

    n

    [foreach 286]n

    n

    Hyon-Mu Jo, Song-Hyok Kim, Ji-Hyon Kim, Ju-Song Thak, Yong-Gil Han,

    n t

  • n

    n[/foreach]

    n

n[if 2099 not_equal=”Yes”]n

    [foreach 286] [if 1175 not_equal=””]n t

  1. Assistant Professor, Assistant Professor, Assistant Professor, Assistant Professor, Assistant Professor, Department of Mechanical Science and Technology, Kim Chaek University of Technology, Department of Mechanical Science and Technology, Kim Chaek University of Technology, Department of Mechanical Science and Technology, Kim Chaek University of Technology, Department of Mechanical Science and Technology, Kim Chaek University of Technology, Department of Mechanical Science and Technology, Kim Chaek University of Technology, Pyongyang, Pyongyang, Pyongyang, Pyongyang, Pyongyang, North Korea, North Korea, North Korea, North Korea, North Korea
  2. n[/if 1175][/foreach]

n[/if 2099][if 2099 equals=”Yes”][/if 2099]n

n

Abstract

n

n

nIt was a long time since mankind explored and studied the universe, but the early-age power sources have not changed a lot over that period. Solar panels have been used long ago and are still in use today. However, their efficiency has improved considerably. Large and complicated solar arrays are now used instead of simply attaching the panels directly on the face of the satellite. A solar array is essential for a spacecraft to carry out its mission successfully and the first task for the spacecraft in space is the deployment of the solar array. Since there is not much space in the nose cone of the launch vehicle, a stowed position of the solar panels is required. Also, during launch and ascent, the launch loads can be transmitted to the satellite structure in a better way, because of the stiffness of the solar array in the stowed configuration and its ability to take up high natural frequencies. A solar array is attached to the satellite by means of a yoke. The purpose of the yoke is to keep the array out of the satellite’s own shadow, and several solar panels are connected by a rotating hinge here. In general, these solar arrays are deployed synchronously by a synchronous mechanism. The synchronization system controls the relative movement of the yoke and the panels with respect to the sidewall of the satellite. Hereby interference of the solar array with the satellite is prevented. The closed cable loop (CCL) is a typical synchronous mechanism for the solar array deployment. The closed cable loop device is known as a suitable instrument for deploying solar array configurations and arrays. This study provides a multi- DOF dynamic model of a solar array with n panels using the CCL. A formula to calculate the synchronous torque for the ideal synchronization is derived from the dynamic model, and its characteristics are analyzed. And then, the decision method of the maximum synchronous torque is provided. The calculation results indicate that the method is accurate enough and can be used to determine the CCL design parameters.nn

n

n

n

Keywords: Solar array, deployment, multi-DOF dynamic model, synchronous torque, linkage

n[if 424 equals=”Regular Issue”][This article belongs to Journal of Aerospace Engineering & Technology ]

n

[/if 424][if 424 equals=”Special Issue”][This article belongs to Special Issue under section in Journal of Aerospace Engineering & Technology (joaet)][/if 424][if 424 equals=”Conference”]This article belongs to Conference [/if 424]

n

n

n

How to cite this article:
nHyon-Mu Jo, Song-Hyok Kim, Ji-Hyon Kim, Ju-Song Thak, Yong-Gil Han. [if 2584 equals=”][226 wpautop=0 striphtml=1][else]The Decision of the Maximum Synchronous Torque During the Solar Array Deployment Using the Closed Cable Loop[/if 2584]. Journal of Aerospace Engineering & Technology. 25/09/2025; 15(15):37-49.

n

How to cite this URL:
nHyon-Mu Jo, Song-Hyok Kim, Ji-Hyon Kim, Ju-Song Thak, Yong-Gil Han. [if 2584 equals=”][226 striphtml=1][else]The Decision of the Maximum Synchronous Torque During the Solar Array Deployment Using the Closed Cable Loop[/if 2584]. Journal of Aerospace Engineering & Technology. 25/09/2025; 15(15):37-49. Available from: https://journals.stmjournals.com/joaet/article=25/09/2025/view=0

nn

n

n[if 992 equals=”Open Access”]Full Text PDF[/if 992]n

n

n[if 992 not_equal=”Open Access”]n

n

n[/if 992]n

nn

nnn

n[if 379 not_equal=””]nn

Browse Figures

n

n

n[foreach 379]

figures

[/foreach]n

n

n

n[/if 379]

n

n

n

n

n

References n

n[if 1104 equals=””]n

  1. Birhanu F, Chen ZB, Ma WS. Modeling and simulation of satellite solar panel deployment and locking. Inf Technol J. 2010; 9(3): 600–4.
  2. Ding XL, Li X. Design and test analysis of a solar array root hinge drive assembly. Chin J Mech Eng. 2014; 27(5): 909–18.
  3. Jorgensen JR, Louis EL, Hinkle JD, Silver MJ. Dynamics of an elastically deployable solar array: ground test model validation. In: AIAA Paper 2005-1942. 2005.
  4. Li HQ, Liu XF, Duan LC, Cai GP. Deployment and control of spacecraft solar array considering joint stick-slip friction. Aerosp Sci Technol. 2015; 42: 342–52.
  5. Li XZ, Zheng FB, Yang Z, Xi BC. Dynamic response of solar panel deployment on spacecraft system considering joint clearance. Acta Astronaut. 2012; 81: 174–85.
  6. Wallrapp O, Wiedemann S. Simulation of the deployment of a flexible solar array. Multibody Syst Dyn. 2002; 7(1): 101–25.
  7. Narayana BL, Nagaraj BP, Nataraju BS. Deployment dynamics of the solar array with body rates. In: International ADAMS User Conference. 2000.
  8. Li WT. The design and analysis of close cable loop of the solar array. Chin Space Sci Technol. 2006; 26(2): 52–7. Chinese.
  9. Wang TH, Kong XR, Wang BL, Ma XR. The research on principle and function of closed-loop configuration of solar arrays. J Astronautics. 2000;21(3):29–33.
  10. Chen LM. Analysis of the secondary deployment motion of the solar array. Spacecraft Eng. 2001; 10(3): 19–23. Chinese.
  11. Chen LM. Analysis of the change of the closed cable loop tension of the solar array. Spacecraft Eng. 1999; 8(4): 9–13. Chinese.
  12. Ding XL, Li X, Xu K, Yang QL, Pu HL. Study on the behavior of the solar array deployment with root hinge drive assembly. Chin J Aeronaut. 2012; 25: 276–84.
  13. Haynie T, Kriger A. Mechanisms for restraining and deploying a 50-kW solar array. In: 3rd Aerospace Mechanisms Symposium. 1969.
  14. Shabana AA. Dynamics of multibody systems. 4th Edn. Cambridge: Cambridge University Press; 2013.

nn[/if 1104][if 1104 not_equal=””]n

    [foreach 1102]n t

  1. [if 1106 equals=””], [/if 1106][if 1106 not_equal=””],[/if 1106]
  2. n[/foreach]

n[/if 1104]

n


nn[if 1114 equals=”Yes”]n

n[/if 1114]

n

n

[if 424 not_equal=””]Regular Issue[else]Published[/if 424] Subscription Original Research

n

n

[if 2146 equals=”Yes”][/if 2146][if 2146 not_equal=”Yes”][/if 2146]n

n

n

n

n

n

n

n

n

n

n

n

n

n

n

n

n

n

n

n

n[if 1748 not_equal=””]

[else]

[/if 1748]n

n[if 1746 equals=”Retracted”]n

n

n

n

[/if 1746]n[if 4734 not_equal=””]

n

n

n

[/if 4734]n

n

Volume 15
[if 424 equals=”Regular Issue”]Issue[/if 424][if 424 equals=”Special Issue”]Special Issue[/if 424] [if 424 equals=”Conference”][/if 424] 15
Received 30/06/2025
Accepted 16/09/2025
Published 25/09/2025
Retracted
Publication Time 87 Days

n

n

nn


n

Login

n
My IP
n

PlumX Metrics

nn

n

n

n[if 1746 equals=”Retracted”]n

[/if 1746]nnn

nnn”}]