Nikita Namdev Mardhekar,
Swapnali P. God,
- Student, Department of Electrical Engineering, Sinhgad College of Engineering, Korti, Pandharpur, Maharashtra, India
- Assistant Professor, Department of Electrical Engineering, Sinhgad College of Engineering, Korti, Pandharpur, Maharashtra,, India
Abstract
This study offers a practical solution to the frequent power outages in places like Nigeria, where having backup power sources, such as inverters, is crucial. To make switching between the main power supply and backup power easier, the authors created a simple but effective transfer switch. The design uses important components like an electromechanical relay, a contactor, a voltage monitoring relay, and delay timer relays to ensure smooth switching between power sources. The system was first tested on a breadboard before being assembled onto a printed circuit board (PCB) for the final version. The transfer switch has 66.3% efficiency, which is typical for this kind of a power system, and can handle a maximum load of 10 A. This affordable system improves the reliability of backup power for both emergencies and everyday use. In the future, the authors suggest using more efficient power supplies to reduce energy loss and improve performance.
Keywords: Power system, backup power source, inverter, transfer switch, automatic switching, relays, circuit testing, PCB, power supply unit, voltage comparator, switching system
[This article belongs to Journal of Electronic Design Technology ]
Nikita Namdev Mardhekar, Swapnali P. God. Development of a Cost-Effective Automatic Power Transfer Switch for Backup Energy Systems. Journal of Electronic Design Technology. 2025; 16(01):7-12.
Nikita Namdev Mardhekar, Swapnali P. God. Development of a Cost-Effective Automatic Power Transfer Switch for Backup Energy Systems. Journal of Electronic Design Technology. 2025; 16(01):7-12. Available from: https://journals.stmjournals.com/joedt/article=2025/view=208839
References
1. Supardi A, Binava ZA. Automatic power transfer switch with the internet of things-based monitoring system. In AIP Conf Proc. 2024 Jan 17; 2926(1): 020115. AIP Publishing.
2. Darmanto NA, Mahardika BW. Design and Development of Automatic Transfer Switch System, Energy Saving Emergency Panel. In 2020 IEEE 7th International Conference on Information Technology, Computer, and Electrical Engineering (ICITACEE). 2020 Sep 24; 300–303.
3. Jean-Rostand FK, Mustapha MM, Adabara I, Hassan AS. Design of an automatic transfer switch for households solar PV system. European Journal of Advances in Engineering and Technology (EJAET). 2019; 6(2): 54–65.
4. Hasanah RN, Soeprapto S, Adi HP. Arduino-Based Automatic Transfer Switch for Domestic Emergency Power Generator-Set. In 2018 2nd IEEE Advanced Information Management, Communicates, Electronic and Automation Control Conference (IMCEC). 2018 May 25; 742–746.
5. Wakudkar HT, Mawale PV, Tikhe SJ. Automatic Transfer Switch for Power Generator. Int Res J Eng Technol. 2018 Feb; 5(2): 240–1.
6. Muneer A, Amjad F, Jabbar MW, Saleem U. Development of automatic switch for electric power transfer. Eng Proc. 2022 Jan 6; 12(1): 72.
7. God Swapna, Bhosale Nandini, Mardhekar Nikita, Kambire Akanksha, Bendgude Komal. Automatic Transfer Switch Control Panel. Int J Res Appl Sci Eng Technol. 2024 Apr; 12(IV): 1765–1769.
8. Hidayat MN, Wijaya WS, Putri RI. Implementation of Automatic Transfer Switch on DC System. In IEEE 2022 International Conference on Electrical and Information Technology (IEIT). 2022 Sep 15; 218–224.
9. Kabir MA, Fahim KR, Hasan T, Ali MA, Hossain MA. Automatic Transfer Switch Using Programmable Logic Controller. In 2021 IEEE International Conference on Science & Contemporary Technologies (ICSCT). 2021 Aug 5; 1–6.
10. Narvios WMO, Unabia SM, Batayola FF, Remo KJ, Villarin EM, Nguyen YQ. IoT based automatic transfer switch with monitoring and control system. In AIP Conf Proc. 2022 Oct 26; 2502(1): 020003. AIP Publishing.

Journal of Electronic Design Technology
| Volume | 16 |
| Issue | 01 |
| Received | 23/12/2024 |
| Accepted | 30/01/2025 |
| Published | 08/03/2025 |
| Publication Time | 75 Days |
Login
PlumX Metrics