Current Issue

Regular Issue  Subscription Case Study Published on :- 26/12/2025
Reimagining Solid Waste Management in India: A case of Circular approach in C&D Waste Management

Sayan Munshi, Aditee Prabhakar, Rajarshi, Sweta Rupapara
Keywords: Construction and demolition waste, circular economy, waste management, urban sustainability, life cycle assessment (LCA), resource efficiency, carbon footprint, Swachh Bharat Mission 2.0, landfill overflow, waste-to-energy, urban heat island, recycling infrastructure, sustainable development, legacy waste, environmental impact, real estate sector, biomining, Thilafushi island, prefabrication, modular construction.

1-10
Regular Issue  Subscription Original Research Published on :- 12/01/2026
Sustainable Materials Management: Strategies for Reducing Waste and Enhancing Resource Efficiency in Construction

Gundran Marthy James S, Guico Dann Dexter G
Keywords: Construction industry, eco-friendly structures, economic development, natural resources, sustainable materials

11-23
Regular Issue  Subscription Original Research Published on :- 20/01/2026
An Empirical Analysis of Cost, Time, and Quality Relationships Using Correlation and Regression Techniques

Veda Venkatesan, Prabakaran R
Keywords: Correlation analysis, project management triangle, quality management, regression modeling, statistical analysis in construction, time–cost–quality relationship.

52-60
Regular Issue  Subscription Original Research Published on :- 01/02/2026
From Waste to Strength: Hybrid Binder Approach for Sustainable M25 Concrete

Tanushree Dalai, Bitishree Patel, Madhusmita Biswal
Keywords: Fly ash cenospheres, hybrid binder system, mechanical properties, non-destructive testing, partial cement replacement, silica fume, sustainable concrete.

24-32
Regular Issue  Subscription Original Research Published on :- 04/02/2026
Comparative Study of Time Slice Windows Analysis and Impacted As-Planned Analysis for Data Center Construction Projects Using Primavera P6 24.12 Version

Sachinkumar Sahu, Raju Narwade, Karthik Nagarajan
Keywords: Construction, data center, delay analysis, impacted as-planned analysis (IAPA), time slice windows analysis (TSWA)

33-51